Central Térmica San Nicolás

Thermal power plant fired by coal, fuel oil and gas located on the right bank of river Parana, in the province of Buenos Aires.
It has an installed capacity of 650 MW and was acquired by AES in March 1993.

Technical Data

Units #1 and #2: Boiler:
Steinmüller (111 Kg/cm²  300 tn/h).
Turbine: Siemens. Axial Flow. Generator: Siemens (13,2 Kv).
Units #3 and #4: Boiler:
Steinmüller (111 Kg/cm²  300 tn/h).
Turbine: AEG. Axial flow. Generator: Siemens (13,2 Kv).
Unit #5:
Boiler: Franco Tosi, 195 kg/cm² (1.195 tn/h).
Turbine: Ansaldo. Generator: Ercoli Marelli. 20 Kv- 350 MW.
Black start unit: Alsthom gas turbine
TG. Ms- 5001. 11Kv -25 Mw. Start up motor: Detroit. 500 Cv 12 cylinders.


 








Institutional
| Our Businesses | Social Responsibility | Certifications | News | Contact


Copyright © 2010 The AES Corporation. All rights reserved.
Reproduction in whole or in part in any form or medium without the express written permission of The AES Corporation is prohibited.
AES and the AES logo are trademarks of The AES Corporation.