Ullum

Hydroelectric development on river San Juan in the province of San Juan.
It has an installed capacity of 45 MW and was acquired by AES in March 1996.

Technical Data

Type: Derivation dam, mobile type
Spillway type: surface, with sector gates
Maximum discharge capacity: 2,500 m³/sec.
Maximum height: 13 m
Crest length: 135 m
Dam volume: 36,000 m³.  

 

 








Institutional
| Our Businesses | Social Responsibility | Certifications | News | Contact


Copyright © 2010 The AES Corporation. All rights reserved.
Reproduction in whole or in part in any form or medium without the express written permission of The AES Corporation is prohibited.
AES and the AES logo are trademarks of The AES Corporation.